(1)
Jonathan, F.; Mulyana, R.; Prasetyo, Y. A.; Nasution, S. T.; Damayanti, D. D.; Juliani, W. FLOWSHOP SCHEDULING WITH SEQUENCE DEPENDENT SET-UP TIME USING IMMUNE ALGORITHM TO REDUCE MAKESPAN IN PT. XYZ BANDUNG AS A TEXTILE INDUSTRY. IJIES 2019, 3, 24-30.