Aziz Irsyad et al. 2024. Schedule Acceleration Planning in Construction Project (Case Study: Japek II Selatan Tollroad). International Journal of Innovation in Enterprise System. 6, 1 (Oct. 2024), 24–37. DOI:https://doi.org/10.25124/ijies.v6i01.145.