Designing Project Stakeholder Management Plan at Coffee Plant Construction Project for Sucessful Initiating Phase in Ciwidey

Authors

  • Tien Fabrianti Kusumasari
  • Devi Pratami
  • Nurfitri Ayu Puspitasari
  • Imam Haryono

Abstract

CV Trianom Agrotektur is a company engaged in coffee industry. Due to high demand and expanded business process the company owner is going to build a new plant in Ciwidey. The current plant cannot cover the whole business process of in processing coffee beans. The extensification towards the plant requires some guidance to lead the successful contruction project. However, building plants in rural area is not a simple thing. There should be some investigation towards stakeholders’ needs/interests or requirements. The project should also face an issue pertaining to management, i.e. how to manage stakeholders who still keep their local tradition. This study is aimed at designing project stakeholder management plan based on PMBOK 5 edition. The study shows that there are 21 stakeholders classified in 4 quadrants. Those stakeholders will be managed based on their power and interest level.

Keywords— Stakeholder, Communication, Project, Coffee Plant

Downloads

Published

2017-12-31

How to Cite

Kusumasari, T. F., Pratami, D., Puspitasari, N. A., & Haryono, I. (2017). Designing Project Stakeholder Management Plan at Coffee Plant Construction Project for Sucessful Initiating Phase in Ciwidey. International Journal of Innovation in Enterprise System, 1(1), 19–28. Retrieved from https://ijies.telkomuniversity.ac.id/index.php/IJIES/article/view/6

Issue

Section

Information and Computational Engineering